Welcome to the Weekly Wrap! The home of Before and After shots, videos, and a general look into what our team achieves in one week.
Making Way For The View
At Budge Street in Fordell; the digger has cleared the way for the rural views from the north-facing living area, while also excavating the concrete patio area waiting to be poured. Tiling in the bathroom has also been completed. This home will be a Summer sun trap!
First Things First At Cambridge
This week, the first job at Lot 5, Cambridge Street was to start on the retaining wall. A new 121sqm home will be built on this lot very soon. There are still three lots available, ranging from 400-430sqm. Plus our 3-bedroom home on the market. For more information on this development, see the Bayley’s listing HERE
Prepping For Roof At Mathieson
Our Mathieson Street project is moving forward at a fast pace! This week we had the scaffolding and safety nets installed, preparing for the roof installation. We are stoked to have been awarded the SiteWise Gold certification, which means Venture Build is dedicated to maintaining the highest standards in health and safety practices.
Roof Shout!
To finish the week, we have a roof and walls at our studio extension on Number 2 Line. From full new builds, developments, or extensions, along with helping you navigate the tricky parts of property infill, have a chat with us!
And that’s another Wrap! Have a great weekend!